About Us

One register, for the whole of Jigawa State

LIAMS is the single, authoritative record of land in Jigawa State — every layout, every surveyed parcel and every grant, held in one register the public can check.

0

Approved layouts

0

Registered plots

0

Applications lodged

27

LGAs covered

The Ministry

Ministry of Land, Housing, Urban Development and Regional Planning

The Ministry is the authority through which Jigawa State administers land under the Land Use Act. It surveys and approves layouts, allocates State land, issues Certificates of Occupancy, registers dealings, and assesses the ground rent and statutory fees payable on land.

Its work is carried out by departments that this system mirrors directly: the Survey Department, which observes boundaries and pegs beacons; Urban and Regional Planning, which designs layouts and reserves land for public purpose; the GIS Department, which forms parcels and holds the spatial register; and the Land Department, which allocates, issues title and records every subsequent dealing.

Each of those desks writes to the same register. That is the change LIAMS represents: not a new filing cabinet beside the old ones, but a single record that every department reads from and writes to, with every entry attributable to the officer who made it.

What LIAMS holds

Layout boundaries and their approval history; every beacon with its observed coordinates and stated accuracy; every parcel with its geometry, identifier, land use and current status; road reserves and dedicated public land; allocations, titles, consents, encumbrances and revocations; and the applications and payments behind each of them.

What it does not publish

The identity of a holder, the coordinates of a boundary, the value of a property and the detail of any charge over it are not published. They are released on request to a party who can show an interest, and every release is recorded against the parcel.

How a parcel reaches the register

Six stages, in order

Nothing appears on this site until it has cleared the fifth stage. A layout still in survey, design or beacon capture is unfinished ministry work, and publishing it would advertise parcels that do not yet legally exist.

  1. 01 Gate

    Boundary survey

    A licensed surveyor observes the site boundary and lodges the coordinates. The Surveyor General decides whether to accept them.

  2. 02 Gate

    Layout design

    The town planner divides the site into parcels, road reserves and land dedicated to mosques, schools, clinics and open space.

  3. 03 Gate

    Beacon survey

    Corner pillars are pegged on the ground and their positions lodged. Nothing proceeds until the Surveyor General approves them.

  4. 04 Gate

    Parcel formation

    The GIS team joins approved beacons into parcels and assigns each a permanent identifier. Closure and corner accuracy are checked before submission.

  5. 05 Gate

    GIS validation

    The Head of GIS validates the completed fabric. Only then does the layout become visible on this site.

  6. 06 Outcome

    Allocation

    The Land Department offers parcels to applicants, and the Director and Commissioner approve. A Certificate of Occupancy follows acceptance.

Hon. Commissioner
Message from the Commissioner
Land is the foundation of every home, every business and every farm in Jigawa State. For too long, proving a right to it has depended on paper that could be lost, duplicated or forged. The Land Information and Administration Management System changes that. Every layout the State approves, every parcel our surveyors peg and every grant this Ministry makes is now recorded once, in one place, and can be checked by anyone holding a plot number. I invite every citizen to use this platform: verify before you buy, apply through the proper channel, and hold this Ministry to the service standards published here.
Hon. Commissioner
Honourable Commissioner, Ministry of Land, Housing, Urban Development and Regional Planning
Core Values

The commitments behind the record

Integrity

The register records what was decided, not what is convenient. Every entry is attributable to the officer who made it.

Transparency

What the law allows the public to see, the public can see — free of charge and without an intermediary.

Accuracy

Boundaries are held to survey tolerance and checked against the beacons that define them on the ground.

Custody

Personal and proprietary detail is released only to those entitled to it, and every release is logged.

Responsiveness

Each stage carries a service target, and a file that overruns it becomes visible to management.

Equity

The same process, the same fees and the same queue apply to every applicant.

Aim & Objectives

What we are working towards

One authoritative register

Replace scattered paper files and parallel spreadsheets with a single spatial register in which every parcel has one geometry, one identifier and one current holder.

Security of tenure

Give every allocation and every Certificate of Occupancy a traceable, verifiable record, so a holder can prove their interest and a buyer can check it before paying.

A shorter route to title

Move applications through survey, planning, allocation and issuance on defined stages with published service targets, so a file is never simply lost on a desk.

Land revenue that reconciles

Assess ground rent and statutory fees against the register itself, so what is billed and what is collected can be reconciled parcel by parcel.

Planned, orderly growth

Hold layouts, road reserves and public land — mosques, schools, clinics, open space — as part of the fabric, so public purpose is protected before land is offered.

Service the citizen can see

Publish what can safely be published, and let anyone verify a plot number without travelling to Dutse or paying an intermediary.